---
title: Reports
slug: suite-documentation/RiaY-reports
docTags: 
createdAt: 2025-11-16T16:32:35.634Z
---

The **Reports (Execution Results)** page provides a consolidated view of plan executions across your projects. It allows you to review historical results, analyze execution trends, filter plan runs, export report data, and access the detailed report of an individual execution.

The page includes:

- Report filters
- Project Summary charts
- Total running time
- A table of individual plan executions

The displayed summary and execution records are updated according to the applied filters.

## Filtering Reports

Use the filters on the left side of the page to define which executions are included in the report.

### Project

Use the **Project** filter to display executions belonging to a specific project.

Select **All Projects** to include executions from every project available to your account.

### Plans (Containing)

Use the **Plans (Containing)** filter to narrow down the results by plan name.

The report displays plan executions whose names contain the selected or entered value. Select **All Plans** to include every plan within the selected project scope.

### Run Date

Use the **From** and **To** fields to define a custom execution date range.

You can also use one of the predefined date ranges:

- **Today**
- **Last 7 Days**
- **Last 14 Days**
- **Last 30 Days**
- **Last 90 Days**

The selected date range is displayed in the **Project Summary** heading.

### Show Only Failed Tests

Enable **Show only failed tests** to display only plan executions containing at least one test result with the **Failure** status.

This filter applies specifically to the **Failure** status. An execution containing only **Error**, **Stopped**, **Unexecuted**, **Warning**, or **Timed Out** results is not included unless it also contains a Failure result.

## Project Summary

The **Project Summary** section provides a visual overview of the test results included in the current report.

### Result Distribution

The pie chart shows the percentage distribution of test results by status.

The following statuses may be displayed:

- **Success**
- **Warning**
- **Failure**
- **Error**
- **Unexecuted**
- **Stopped**
- **Timed Out**

Statuses without any matching results may still appear in the chart legend with a value of 0%.

For detailed descriptions of each status, see [Execution Statuses](docId\:HEh4Wub6dMSZrX3gqC-6b).

### Result Trend

The line chart shows how the number of test results changes throughout the selected date range.

Each line represents a different result status. You can use the chart to:

- Compare successful and unsuccessful result volumes
- Identify increases in failures, errors, or stopped tests
- Review result changes across different execution dates
- Detect unusual execution patterns
- Monitor execution stability over time

The horizontal axis represents execution dates, while the vertical axis represents the number of test results.

### Total Running Time

The **Total Running Time** value shows the combined runtime of all plan executions included in the current report.

The value is recalculated whenever the project, plan, date range, or failure filter is changed.

## Execution Table

The table below the Project Summary lists the individual plan executions matching the currently applied filters.

### Table Columns

| Column          | Description                                          |
| --------------- | ---------------------------------------------------- |
| **Plan**        | Name of the executed plan                            |
| **Project**     | Name of the project associated with the plan         |
| **Run Date**    | Date and time when the plan execution started        |
| **Runtime**     | Total runtime of the plan execution                  |
| **Test Result** | Number of test results grouped by status             |
| **Details**     | Opens the detailed report for the selected execution |

### Test Result Counters

The **Test Result** column displays a status icon and result count for each status found in the execution.

For example, a plan execution may contain:

- 159 successful tests
- 354 failed tests
- 114 stopped tests

Only the statuses applicable to the selected execution may be displayed in its row.

For detailed information about the result statuses and their icons, see Execution Statuses.

### Viewing Execution Details

Select **Details** at the end of a row to open the detailed report for that plan execution.

The detailed report provides execution-specific information and access to the individual test results associated with the plan run.

## Exporting the Report Table

Select **Export Table** to download the report records as a **CSV file**.

The exported file reflects the filters currently applied to the page, including:

- Selected project
- Selected plan
- Run date range

### Exported CSV Columns

The CSV file contains the following columns:

| Column           | Description                                    |
| ---------------- | ---------------------------------------------- |
| **ID**           | Unique identifier of the plan execution        |
| **PLAN NAME**    | Name of the executed plan                      |
| **PROJECT NAME** | Name of the project associated with the plan   |
| **RUN DATE**     | Date and time when the execution started       |
| **RUNTIME**      | Runtime of the execution in milliseconds       |
| **SUCCESS**      | Number of test results with the Success status |
| **FAILURE**      | Number of test results with the Failure status |
| **ERROR**        | Number of test results with the Error status   |

The **Run Date** value is exported in the following format:

YYYY/MM/DD HH\:mm

The **Runtime** value is exported in milliseconds. For example:

15641000

corresponds to:

04h 20m 41s

When an execution does not contain a result for one of the exported statuses, the corresponding field may be left empty.
